Our Work

Projects

A selection of completed projects across Ontario. Details have been generalized to protect client privacy.

Well Design & Hydrogeological AssessmentSimcoe County

Rural Residential Well Design — Simcoe County

Challenge

A landowner was severing a rural lot for a new home and needed a hydrogeological assessment and well design to satisfy the municipality's planning conditions.

Approach

We conducted a site investigation, reviewed regional groundwater data, and prepared a hydrogeological assessment demonstrating adequate water supply. A well design was produced in accordance with O. Reg. 903 and submitted with the building permit application.

Outcome

Planning conditions were satisfied and the building permit was issued. The well was drilled and completed to the design specifications.

Septic System Design & ApprovalsKawartha Lakes

Replacement Septic System — Kawartha Lakes

Challenge

A failing conventional septic system on a mature rural property needed to be replaced. The lot had limited area for a new leaching bed and a high seasonal water table.

Approach

We completed a site evaluation and percolation testing to characterize the soil conditions. A raised bed system was designed to address the water table constraints, and a permit application was prepared and submitted to the local municipality.

Outcome

The permit was approved and the replacement system was installed. The property's sewage system is now fully compliant with current Ontario Building Code requirements.

Hydrogeological AssessmentGrey County

Subdivision Water Supply Study — Grey County

Challenge

A developer proposed a rural residential subdivision requiring a water supply study to demonstrate that groundwater could support the proposed number of lots without adverse impacts on neighbouring wells.

Approach

We reviewed regional hydrogeology, conducted field investigations, and prepared a water supply study addressing yield, quality, and interference potential. The report was submitted in support of the draft plan of subdivision application.

Outcome

The water supply study satisfied the municipality and conservation authority's requirements. Draft plan approval was granted with conditions related to individual well design at the building permit stage.

Septic System Design & ApprovalsMuskoka

Septic Design for New Cottage Construction — Muskoka

Challenge

A property owner was constructing a new four-season cottage on a waterfront lot. Setback requirements from the lake and limited lot area constrained the available location for a sewage system.

Approach

We evaluated the site, conducted percolation testing, and designed a system that met all required setbacks while fitting within the available area. The permit application was coordinated with the local building department.

Outcome

The sewage system permit was issued and the system was installed prior to construction completion. The design met all setback and sizing requirements under Part 8 of the Ontario Building Code.

Permit Applications & Regulatory ComplianceNorthumberland County

Well Permit Application — Northumberland County

Challenge

A contractor needed a well permit for a new residential well on a rural property. The application required a well design and supporting documentation submitted to the Ministry of the Environment.

Approach

We prepared the well design and permit application package in accordance with O. Reg. 903 requirements and submitted it on behalf of the client.

Outcome

The well permit was issued and the well was drilled and completed as designed.

Septic System Design & ApprovalsHaliburton County

Holding Tank Design & Approval — Haliburton

Challenge

A seasonal property had no existing sewage system and the site conditions — shallow bedrock and limited lot area — ruled out a conventional or raised bed system. A holding tank was the only viable option.

Approach

We confirmed site constraints through investigation, designed a holding tank system sized for the proposed use, and prepared the permit application with supporting documentation.

Outcome

The permit was approved and the holding tank was installed, allowing the property to be used as intended within the constraints of the site.

Working on a project?

Every site is different. If you have a project in mind — whether it's a new build, a severance, or a system replacement — get in touch and we'll talk through what's involved.

Get in Touch